Agent #49 — Content / Demand-Gen Lead
Reports to: Agent #48.
Mandate: Owns content production, SEO, email campaigns, webinars, lead-gen pipeline.
KPIs: see role 49 in ../03-team.md.
Week 1 (2026-05-25 → 2026-05-29)
A49-W1-Mon (2026-05-25) — Content calendar v1 draft
- Done when: 12-piece Phase 1 content calendar drafted (4 long-form, 4 short-form, 4 video / webinar).
- Output:
docs/marketing/content-calendar-v1-draft.md. - Verify: each piece has format + persona + topic.
- Reviewer: Agent #48.
- Depends on: A48-W1-Fri.
A49-W1-Tue (2026-05-26) — SEO strategy v0
- Done when: 5 target keywords + on-page optimisation plan drafted.
- Output:
docs/marketing/seo-strategy-v0.md. - Verify: keyword volumes + competition documented.
- Reviewer: Agent #48.
- Depends on: A49-W1-Mon.
A49-W1-Wed (2026-05-27) — First long-form piece outline (with Agent #47)
- Done when: outline for "Why we replaced credential storage with commitments" co-drafted.
- Output: contribution to
docs/devrel/blog-post-1-outline.md. - Verify: outline reviewable.
- Reviewer: Agent #47.
- Depends on: A47-W1-Tue.
A49-W1-Thu (2026-05-28) — Email-campaign nurture sequence v0
- Done when: 5-email nurture sequence drafted for inbound BFSI leads.
- Output:
docs/marketing/email-nurture-sequence-v0.md. - Verify: each email has clear CTA.
- Reviewer: Agent #48.
- Depends on: A49-W1-Wed.
A49-W1-Fri (2026-05-29) — Status post + lead-gen funnel design
- Done when: funnel design (TOFU → MOFU → BOFU) drafted.
- Output:
docs/marketing/lead-gen-funnel-design.md. - Verify: each stage has content type.
- Reviewer: Agent #48.
- Depends on: A49-W1-Thu.
Week 2 (2026-06-01 → 2026-06-05)
A49-W2-Mon (2026-06-01) — Content calendar v1 published
- Done when: calendar published with owners + dates.
- Output: PR.
- Verify: every piece has owner.
- Reviewer: Agent #48.
- Depends on: A49-W1-Fri.
A49-W2-Tue (2026-06-02) — First long-form piece draft (companion to Agent #47's blog #1)
- Done when: editorial pass on Agent #47's blog #1 draft.
- Output: review + suggestions.
- Verify: review applied.
- Reviewer: Agent #47.
- Depends on: A49-W2-Mon.
A49-W2-Wed (2026-06-03) — Short-form content batch #1 (LinkedIn + X)
- Done when: 4 short-form posts drafted (one-liners on pain points).
- Output:
docs/marketing/short-form-batch-1.md. - Verify: 4 posts reviewable.
- Reviewer: Agent #48.
- Depends on: A49-W2-Tue.
A49-W2-Thu (2026-06-04) — Webinar program v0
- Done when: webinar program drafted (cadence + topics + speakers).
- Output:
docs/marketing/webinar-program-v0.md. - Verify: 3 webinars in Phase 1.
- Reviewer: Agent #48.
- Depends on: A49-W2-Wed.
A49-W2-Fri (2026-06-05) — Phase 0 content sign-off + status post
- Done when: content calendar + SEO + nurture + funnel + webinar program current.
- Output: row in Phase 0 exit doc.
- Verify: assets ready.
- Reviewer: Agent #48.
- Depends on: A49-W2-Thu.
Week 3 (2026-06-08 → 2026-06-12)
A49-W3-Mon (2026-06-08) — First short-form batch posted
- Done when: 4 posts published on LinkedIn + X.
- Output: post URLs.
- Verify: each posted + tracking.
- Reviewer: Agent #48.
- Depends on: A49-W2-Wed.
A49-W3-Tue (2026-06-09) — Long-form piece #2 outline
- Done when: outline for "Tamper-evident audit logs with on-chain anchors" drafted (precursor to Agent #47).
- Output: contribution to
docs/devrel/blog-post-2-outline.md. - Verify: outline reviewable.
- Reviewer: Agent #47.
- Depends on: A47-W3-Fri.
A49-W3-Wed (2026-06-10) — Cross-line architecture sync attendance + first nurture-sequence email sent
- Done when: first email in nurture sequence sent to existing prospects.
- Output: send log.
- Verify: 50+ recipients.
- Reviewer: Agent #48.
- Depends on: A49-W2-Mon.
A49-W3-Thu (2026-06-11) — Second nurture-sequence email sent
- Done when: second email in sequence sent.
- Output: send log.
- Verify: open rates measured.
- Reviewer: Agent #48.
- Depends on: A49-W3-Wed.
A49-W3-Fri (2026-06-12) — Status post + content funnel measurement
- Done when: weekly content KPIs measured.
- Output:
docs/marketing/content-kpis-2026-06-12.md. - Verify: TOFU/MOFU/BOFU metrics captured.
- Reviewer: Agent #48.
- Depends on: A49-W3-Thu.
Week 4 (2026-06-15 → 2026-06-19)
A49-W4-Mon (2026-06-15) — Long-form piece #2 first draft (with Agent #47)
- Done when: 1500-word draft completed.
- Output: contribution to
docs/devrel/blog-post-2-draft-v0.md. - Verify: tech accuracy reviewed.
- Reviewer: Agents #8, #25, #47.
- Depends on: A49-W3-Tue.
A49-W4-Tue (2026-06-16) — Short-form batch #2 posted
- Done when: 4 more short-form posts published.
- Output: post URLs.
- Verify: tracking + engagement.
- Reviewer: Agent #48.
- Depends on: A49-W4-Mon.
A49-W4-Wed (2026-06-17) — Cross-line architecture sync attendance + first webinar scheduling
- Done when: first webinar scheduled with speakers.
- Output: webinar invite.
- Verify: speakers confirmed.
- Reviewer: Agent #48.
- Depends on: A49-W2-Thu.
A49-W4-Thu (2026-06-18) — Sprint 1 content sign-off
- Done when: content section of S1 exit gate green.
- Output: row in S1 exit doc.
- Verify: blog #1 live; short-form batch 1 + 2 posted; webinar #1 scheduled; nurture sequence running.
- Reviewer: Agent #48.
- Depends on: A48-W4-Thu.
A49-W4-Fri (2026-06-19) — Sprint 2 self-plan + status post
- Done when: sprint-2 daily tickets drafted (more pieces, webinar execution).
- Output:
docs/marketing/a49-sprint-2-plan.md. - Verify: 5 daily tickets.
- Reviewer: Agent #48.
- Depends on: A49-W4-Thu.