Agent #45 — Solutions Architect (pre-sales)
Reports to: Agent #42.
Mandate: Owns technical pre-sales — runs live demos, drafts integration architecture, signs technical SOW.
KPIs: see role 45 in ../03-team.md.
Week 1 (2026-05-25 → 2026-05-29)
A45-W1-Mon (2026-05-25) — Integration architecture template draft
- Done when: 3 reference architectures (net-banking, branch teller, txn step-up) drafted.
- Output:
docs/integrations/reference-architectures.mdv0. - Verify: each architecture diagrammed.
- Reviewer: Agent #10.
- Depends on: A42-W1-Mon.
A45-W1-Tue (2026-05-26) — Bank-demo spec deep review (02-bank-demo.md)
- Done when: spec reviewed end-to-end; gaps flagged.
- Output: review comments.
- Verify: every scene reviewed.
- Reviewer: Agent #28.
- Depends on: A45-W1-Mon.
A45-W1-Wed (2026-05-27) — Demo equipment kit specced
- Done when: laptop, Pixel 7, Samsung S22, R307 sensor, OTG cable, projection adapters specced.
- Output:
docs/gtm/demo-equipment-kit.md. - Verify: every item has SKU + vendor.
- Reviewer: Agent #50.
- Depends on: A45-W1-Tue.
A45-W1-Thu (2026-05-28) — Demo equipment ordered
- Done when: order placed; ETA confirmed.
- Output: order ref.
- Verify: items in pipeline.
- Reviewer: Agent #50.
- Depends on: A45-W1-Wed.
A45-W1-Fri (2026-05-29) — Status post + Scene 1 + 2 demo dry-run prep
- Done when: prep notes for scenes 1 + 2 dry run with engineering.
- Output:
docs/gtm/scene-1-2-dry-run-prep.md. - Verify: schedule + script ready.
- Reviewer: Agent #29.
- Depends on: A45-W1-Thu.
Week 2 (2026-06-01 → 2026-06-05)
A45-W2-Mon (2026-06-01) — Reference architectures v1
- Done when: architectures updated with engineering inputs.
- Output: PR.
- Verify: reviewed by Agent #10.
- Reviewer: Agent #10.
- Depends on: A45-W1-Fri.
A45-W2-Tue (2026-06-02) — Scene 4 (breach simulation) script v1
- Done when: operator script for Scene 4 drafted.
- Output: contribution to
02-bank-demo.md. - Verify: legal disclaimer + DPDP §2(t) reference.
- Reviewer: Agents #29, #37.
- Depends on: A45-W2-Mon.
A45-W2-Wed (2026-06-03) — Scene 5 (audit-integrity tamper) script v1
- Done when: operator script for Scene 5 drafted.
- Output: contribution to
02-bank-demo.md. - Verify: tamper demo path safe (sandbox schema only).
- Reviewer: Agents #8, #25.
- Depends on: A45-W2-Tue.
A45-W2-Thu (2026-06-04) — Demo equipment kit assembled
- Done when: kit items received; inventory checked.
- Output:
docs/gtm/demo-kit-inventory-2026-06-04.md. - Verify: every item logged.
- Reviewer: Agent #50.
- Depends on: A45-W1-Thu.
A45-W2-Fri (2026-06-05) — Phase 0 SA sign-off + status post
- Done when: reference architectures + demo equipment + scene scripts current.
- Output: row in Phase 0 exit doc.
- Verify: assets ready.
- Reviewer: Agent #42.
- Depends on: A45-W2-Thu.
Week 3 (2026-06-08 → 2026-06-12)
A45-W3-Mon (2026-06-08) — Demo dry-run with engineering team — Scenes 1 + 2
- Done when: scenes 1 + 2 dry-run; gaps captured.
- Output:
docs/gtm/dry-run-scenes-1-2-2026-06-08.md. - Verify: each scene runs in script.
- Reviewer: Agents #1, #4, #17.
- Depends on: A45-W2-Fri.
A45-W3-Tue (2026-06-09) — Bank-CISO Q&A bank contribution
- Done when: SA contributions to Q&A bank.
- Output: PR contribution to
02-bank-demo.md. - Verify: technical answers complete.
- Reviewer: Agent #29.
- Depends on: A45-W3-Mon.
A45-W3-Wed (2026-06-10) — Cross-line architecture sync attendance + integration SOW template
- Done when: SOW template for integration phase drafted.
- Output:
docs/gtm/integration-sow-template.md. - Verify: scope + timeline + deliverables captured.
- Reviewer: Agent #42.
- Depends on: A45-W3-Tue.
A45-W3-Thu (2026-06-11) — Intro-call prep with Agents #43 + #44
- Done when: SA briefs prepped for first AE intro calls.
- Output: prep notes.
- Verify: 2 prep sessions held.
- Reviewer: Agent #42.
- Depends on: A45-W3-Wed.
A45-W3-Fri (2026-06-12) — Status post + Anchor Bank runbook outline contribution
- Done when: contribution to Agent #35's runbook outline.
- Output: PR contribution.
- Verify: SA voice present.
- Reviewer: Agent #35.
- Depends on: A45-W3-Thu.
Week 4 (2026-06-15 → 2026-06-19)
A45-W4-Mon (2026-06-15) — Demo dry-run #2 with engineering — Scenes 3 + 4 + 5
- Done when: scenes 3-5 dry-run.
- Output:
docs/gtm/dry-run-scenes-3-5-2026-06-15.md. - Verify: each scene runs in script.
- Reviewer: Agents #1, #6, #8.
- Depends on: A45-W3-Mon.
A45-W4-Tue (2026-06-16) — Demo dry-run #3 (full 22-min run)
- Done when: full demo dry-run executed.
- Output:
docs/gtm/dry-run-full-2026-06-16.md. - Verify: 22-min runtime achieved.
- Reviewer: Agents #1, #28, #42.
- Depends on: A45-W4-Mon.
A45-W4-Wed (2026-06-17) — Cross-line architecture sync attendance + first AE intro call SA presence
- Done when: SA present on Agent #43's or #44's intro call.
- Output: contribution notes.
- Verify: SA on call.
- Reviewer: Agent #42.
- Depends on: A43-W4-Mon.
A45-W4-Thu (2026-06-18) — Sprint 1 SA sign-off
- Done when: SA section of S1 exit gate green.
- Output: row in S1 exit doc.
- Verify: 3 dry-runs completed; SOW template + reference architectures current.
- Reviewer: Agent #42.
- Depends on: A42-W4-Thu.
A45-W4-Fri (2026-06-19) — Sprint 2 self-plan + status post
- Done when: sprint-2 daily tickets drafted (dry-runs cont., first demo execution support).
- Output:
docs/gtm/a45-sprint-2-plan.md. - Verify: 5 daily tickets.
- Reviewer: Agent #42.
- Depends on: A45-W4-Thu.