Agent #43 — Enterprise AE (BFSI North)
Reports to: Agent #42.
Mandate: Owns HDFC, ICICI, Yes, IDFC First, Axis (Mumbai / NCR HQs).
KPIs: see role 43 in ../03-team.md.
Week 1 (2026-05-25 → 2026-05-29)
A43-W1-Mon (2026-05-25) — Warm-intro mapping for north banks
- Done when: warm-intro paths to HDFC, ICICI, Axis, Yes, IDFC First CISOs / CTOs / CIOs catalogued.
- Output:
docs/gtm/north-warm-intros.md. - Verify: 5 banks with 1+ warm intro each.
- Reviewer: Agent #42.
- Depends on: A42-W1-Mon.
A43-W1-Tue (2026-05-26) — Per-bank intel pack contribution (north banks)
- Done when: contribution to Agent #29's bank intel packs.
- Output: PR contribution to
docs/product/bank-intel/. - Verify: AE perspective added.
- Reviewer: Agent #29.
- Depends on: A29-W1-Mon.
A43-W1-Wed (2026-05-27) — Outreach sequence v1 (5 emails per bank)
- Done when: outreach sequence drafted (5 emails: cold intro, follow-up, value prop, pain-point, demo invite).
- Output:
docs/gtm/north-outreach-sequence-v1.md. - Verify: 5 templates per bank archetype.
- Reviewer: Agents #29, #48.
- Depends on: A43-W1-Tue.
A43-W1-Thu (2026-05-28) — First 5 emails sent (1 per north bank)
- Done when: first cold-intro email sent to each of 5 banks.
- Output: send log.
- Verify: 5 sends.
- Reviewer: Agent #42.
- Depends on: A43-W1-Wed.
A43-W1-Fri (2026-05-29) — Status post + first replies triage
- Done when: any inbound replies triaged.
- Output:
docs/gtm/north-reply-triage-w1.md. - Verify: reply log current.
- Reviewer: Agent #42.
- Depends on: A43-W1-Thu.
Week 2 (2026-06-01 → 2026-06-05)
A43-W2-Mon (2026-06-01) — Follow-up emails (round 2)
- Done when: round-2 follow-up sent to 5 banks.
- Output: send log.
- Verify: 5 follow-ups sent.
- Reviewer: Agent #42.
- Depends on: A43-W1-Fri.
A43-W2-Tue (2026-06-02) — LinkedIn outreach for 5 north banks
- Done when: LinkedIn connection + brief intro DMs sent to target contacts at 5 banks.
- Output: send log.
- Verify: 10+ LinkedIn requests sent.
- Reviewer: Agent #42.
- Depends on: A43-W2-Mon.
A43-W2-Wed (2026-06-03) — Round-3 emails (value-prop)
- Done when: value-prop email sent to 5 banks.
- Output: send log.
- Verify: 5 sends.
- Reviewer: Agent #42.
- Depends on: A43-W2-Tue.
A43-W2-Thu (2026-06-04) — Reply triage + meeting requests follow-ups
- Done when: any meeting requests progressed.
- Output:
docs/gtm/north-triage-w2.md. - Verify: progress tracked.
- Reviewer: Agent #42.
- Depends on: A43-W2-Wed.
A43-W2-Fri (2026-06-05) — Phase 0 AE-north sign-off + status post
- Done when: outreach sequence v1 complete; first 15 emails sent.
- Output: row in Phase 0 exit doc.
- Verify: send log + reply log current.
- Reviewer: Agent #42.
- Depends on: A43-W2-Thu.
Week 3 (2026-06-08 → 2026-06-12)
A43-W3-Mon (2026-06-08) — First introductory call booked (1 of 2 target)
- Done when: 1 intro call scheduled with a north bank.
- Output: calendar invite.
- Verify: invite confirmed.
- Reviewer: Agents #28, #42.
- Depends on: A43-W2-Fri.
A43-W3-Tue (2026-06-09) — Round-4 emails (pain-point) for non-responders
- Done when: pain-point email sent to non-responding banks.
- Output: send log.
- Verify: 3-4 sends.
- Reviewer: Agent #42.
- Depends on: A43-W3-Mon.
A43-W3-Wed (2026-06-10) — Cross-line architecture sync attendance + intro call prep with Agent #45
- Done when: intro-call prep done (deck + run-through).
- Output: prep notes.
- Verify: SA brief.
- Reviewer: Agent #45.
- Depends on: A43-W3-Tue.
A43-W3-Thu (2026-06-11) — First intro call held
- Done when: call happened; notes captured; follow-up plan agreed.
- Output:
docs/gtm/north-call-2026-06-11.md. - Verify: notes + next step recorded.
- Reviewer: Agents #29, #42.
- Depends on: A43-W3-Mon.
A43-W3-Fri (2026-06-12) — Status post + second intro call booked target
- Done when: second intro call scheduled.
- Output: calendar invite.
- Verify: invite confirmed.
- Reviewer: Agent #42.
- Depends on: A43-W3-Thu.
Week 4 (2026-06-15 → 2026-06-19)
A43-W4-Mon (2026-06-15) — Second intro call held
- Done when: call happened; notes captured.
- Output:
docs/gtm/north-call-2026-06-15.md. - Verify: notes recorded.
- Reviewer: Agents #29, #42.
- Depends on: A43-W3-Fri.
A43-W4-Tue (2026-06-16) — Demo invitation drafted (per-bank personalisation)
- Done when: 3 demo invitations personalised for top-3 banks.
- Output: drafts.
- Verify: personalisation reflects bank intel.
- Reviewer: Agents #29, #42.
- Depends on: A43-W4-Mon.
A43-W4-Wed (2026-06-17) — Cross-line architecture sync attendance + first demo slot pursuit
- Done when: first demo-slot conversations begun with at least 1 bank.
- Output: conversation log.
- Verify: target week 13 demo agreed.
- Reviewer: Agents #28, #29, #42.
- Depends on: A43-W4-Tue.
A43-W4-Thu (2026-06-18) — Sprint 1 AE-north sign-off
- Done when: AE-north section of S1 exit gate green.
- Output: row in S1 exit doc.
- Verify: 2 intro calls held + demo invitations sent.
- Reviewer: Agent #42.
- Depends on: A42-W4-Thu.
A43-W4-Fri (2026-06-19) — Sprint 2 self-plan + status post
- Done when: sprint-2 daily tickets drafted (demo bookings, SOW conversations).
- Output:
docs/gtm/a43-sprint-2-plan.md. - Verify: 5 daily tickets.
- Reviewer: Agent #42.
- Depends on: A43-W4-Thu.