Skip to main content

Agent #32 — Senior Designer (Dashboard UX)

Reports to: Agent #28. Mandate: Owns dashboard visual + interaction design, design system, demo's projector aesthetics. KPIs: see role 32 in ../03-team.md.


Week 1 (2026-05-25 → 2026-05-29)

A32-W1-Mon (2026-05-25) — Design-system audit kickoff (with Agent #3)

  • Done when: existing tokens (spacing, typography, colour, motion) inventoried.
  • Output: contribution to docs/team/frontend/design-token-audit-w1.md.
  • Verify: every token has a Figma reference.
  • Reviewer: Agent #3.
  • Depends on: A03-W1-Mon.

A32-W1-Tue (2026-05-26) — Anchor Bank demo-friendly theme palette exploration

  • Done when: 3 palette options drafted with high-contrast + projector-friendly variants.
  • Output: Figma file + docs/team/design/anchor-bank-palette.md.
  • Verify: each palette tested against contrast ratios.
  • Reviewer: Agent #3.
  • Depends on: A32-W1-Mon.

A32-W1-Wed (2026-05-27) — Users-view mock with allowed-columns-only treatment

  • Done when: users-view mock in Figma with only DID, commitment, tenant, created_at columns.
  • Output: Figma file.
  • Verify: no PII shown; column allowlist respected.
  • Reviewer: Agents #14, #39.
  • Depends on: A32-W1-Tue.

A32-W1-Thu (2026-05-28) — Audit-events table density study

  • Done when: streaming row density + colour-coded severity bands explored.
  • Output: Figma file.
  • Verify: reads at 5 rows/sec without strobing.
  • Reviewer: Agent #14.
  • Depends on: A32-W1-Wed.

A32-W1-Fri (2026-05-29) — Status post + projector-friendly demo-day theme finalised

  • Done when: final theme + variants ready.
  • Output: design-tokens commit + Figma file.
  • Verify: theme renders well at 3m projection distance.
  • Reviewer: Agent #45.
  • Depends on: A32-W1-Thu.

Week 2 (2026-06-01 → 2026-06-05)

A32-W2-Mon (2026-06-01) — Audit-integrity view mock

  • Done when: PASS / FAIL state mocks + on-chain anchor link treatment in Figma.
  • Output: Figma file.
  • Verify: clear semantic colour use; Basescan logo treatment.
  • Reviewer: Agents #3, #14.
  • Depends on: A32-W1-Fri.

A32-W2-Tue (2026-06-02) — Audit-anchors sub-view mock

  • Done when: anchors table mock with status + tx hash + Basescan link.
  • Output: Figma file.
  • Verify: spacing consistent with tokens.
  • Reviewer: Agent #14.
  • Depends on: A32-W2-Mon.

A32-W2-Wed (2026-06-03) — Design review session with Agent #14 + Agent #3

  • Done when: audit-integrity + audit-anchors mocks reviewed.
  • Output: revised mocks.
  • Verify: feedback applied.
  • Reviewer: Agents #3, #14.
  • Depends on: A32-W2-Tue.

A32-W2-Thu (2026-06-04) — Accessibility audit on dashboard

  • Done when: Lighthouse accessibility ≥ 95 target tracked across critical routes.
  • Output: docs/team/design/dashboard-a11y-audit.md.
  • Verify: each route has score.
  • Reviewer: Agent #3.
  • Depends on: A32-W2-Wed.

A32-W2-Fri (2026-06-05) — Phase 0 design sign-off + status post

  • Done when: tokens + Anchor Bank palette + users view mock + audit-integrity mock ready.
  • Output: row in Phase 0 exit doc.
  • Verify: design assets in Figma + referenced.
  • Reviewer: Agent #28.
  • Depends on: A32-W2-Thu.

Week 3 (2026-06-08 → 2026-06-12)

A32-W3-Mon (2026-06-08) — Kiosk demo design v0

  • Done when: kiosk full-screen QR layout + post-verify success state designed.
  • Output: Figma file.
  • Verify: layout works on 22"+ kiosk displays.
  • Reviewer: Agents #15, #20.
  • Depends on: A32-W2-Fri.

A32-W3-Tue (2026-06-09) — Anchor Bank skin tokens drafted with Agent #3

  • Done when: branded skin tokens diffed from default.
  • Output: contribution to docs/team/frontend/anchor-bank-skin.md.
  • Verify: tokens captured.
  • Reviewer: Agent #3.
  • Depends on: A32-W3-Mon.

A32-W3-Wed (2026-06-10) — Cross-line architecture sync attendance

  • Done when: sync attended.
  • Output: sync notes contribution.
  • Verify: notes published.
  • Reviewer: Agent #3.
  • Depends on: A32-W3-Tue.

A32-W3-Thu (2026-06-11) — Bank-CISO usability test plan

  • Done when: usability test plan for Scene 4 (breach simulation) view designed.
  • Output: docs/team/design/scene-4-usability-test-plan.md.
  • Verify: covers psql admin shell layout + DPDP §2(t) reading flow.
  • Reviewer: Agent #29.
  • Depends on: A32-W3-Wed.

A32-W3-Fri (2026-06-12) — Status post + first usability test run with mock CISO

  • Done when: 1 internal usability test run; insights captured.
  • Output: docs/team/design/usability-test-2026-06-12.md.
  • Verify: top-3 insights logged.
  • Reviewer: Agent #29.
  • Depends on: A32-W3-Thu.

Week 4 (2026-06-15 → 2026-06-19)

A32-W4-Mon (2026-06-15) — Operator console helpers design (precursor C-187 + C-188)

  • Done when: operator console helpers (breach-sim toggle, audit-tamper-demo toggle) designed.
  • Output: Figma file.
  • Verify: helpers clearly demarcated as operator-only.
  • Reviewer: Agents #14, #15, #45.
  • Depends on: A32-W3-Fri.

A32-W4-Tue (2026-06-16) — Kiosk demo-day UX run-through with Agent #15

  • Done when: visual run-through done; final fixes captured.
  • Output: revised Figma + notes.
  • Verify: Anchor Bank skin renders on projection.
  • Reviewer: Agent #15.
  • Depends on: A32-W4-Mon.

A32-W4-Wed (2026-06-17) — Cross-line architecture sync attendance + workforce-mode tile design (precursor C-189)

  • Done when: workforce-mode tenant tile mock drafted.
  • Output: Figma file.
  • Verify: design hints workforce vs consumer mode visually.
  • Reviewer: Agent #14.
  • Depends on: A32-W4-Tue.

A32-W4-Thu (2026-06-18) — Sprint 1 design sign-off

  • Done when: design section of S1 exit gate green.
  • Output: row in S1 exit doc.
  • Verify: kiosk + audit-integrity + Anchor Bank skin all ready.
  • Reviewer: Agent #28.
  • Depends on: A28-W4-Thu.

A32-W4-Fri (2026-06-19) — Sprint 2 self-plan + status post

  • Done when: sprint-2 daily tickets drafted.
  • Output: docs/team/design/a32-sprint-2-plan.md.
  • Verify: 5 daily tickets.
  • Reviewer: Agent #28.
  • Depends on: A32-W4-Thu.