Skip to main content

Agent #29 — Senior PM (BFSI)

Reports to: Agent #28. Mandate: Owns bank demo, BFSI pain-point research, bank-CISO/CFO/CRO narrative. KPIs: see role 29 in ../03-team.md.


Week 1 (2026-05-25 → 2026-05-29)

A29-W1-Mon (2026-05-25) — Per-bank intel pack kickoff (HDFC + ICICI)

  • Done when: intel pack drafted: CISO name, recent breach/audit posture, RBI inspection cycle.
  • Output: docs/product/bank-intel/hdfc.md, icici.md.
  • Verify: 5 fields per bank: CISO, CFO, CRO, CIO, last RBI inspection date.
  • Reviewer: Agent #28.
  • Depends on: A28-W1-Mon.

A29-W1-Tue (2026-05-26) — Per-bank intel pack (Axis + SBI YONO)

  • Done when: 2 more bank intel packs drafted.
  • Output: docs/product/bank-intel/axis.md, sbi-yono.md.
  • Verify: 5 fields per bank.
  • Reviewer: Agent #28.
  • Depends on: A29-W1-Mon.

A29-W1-Wed (2026-05-27) — Per-bank intel pack (IDFC First + RBL)

  • Done when: 2 more bank intel packs drafted.
  • Output: docs/product/bank-intel/idfc-first.md, rbl.md.
  • Verify: 5 fields per bank.
  • Reviewer: Agent #28.
  • Depends on: A29-W1-Tue.

A29-W1-Thu (2026-05-28) — Bank-CISO Q&A bank expansion in 02-bank-demo.md

  • Done when: Q&A bank now has bank-specific lines (e.g., HDFC-style RBI question, ICICI-style breach question).
  • Output: PR.
  • Verify: 6 bank-specific questions added.
  • Reviewer: Agent #28.
  • Depends on: A29-W1-Wed.

A29-W1-Fri (2026-05-29) — Status post + pain-point quantification cross-check

  • Done when: cost-of-pain numbers validated against 2 industry analyst sources.
  • Output: docs/product/pain-point-validation.md.
  • Verify: every cost figure cited.
  • Reviewer: Agent #28.
  • Depends on: A29-W1-Thu.

Week 2 (2026-06-01 → 2026-06-05)

A29-W2-Mon (2026-06-01) — Pain-points v1.1 PR

  • Done when: → 01-pain-points.md updated with validation; new sources cited.
  • Output: PR.
  • Verify: every pain has at least 1 cited source.
  • Reviewer: Agent #28.
  • Depends on: A29-W1-Fri.

A29-W2-Tue (2026-06-02) — Bank-CISO interview pre-work

  • Done when: 3 banker-CISO interview scripts drafted for upcoming first calls.
  • Output: docs/product/banker-interview-scripts.md.
  • Verify: each script ~10 questions.
  • Reviewer: Agent #28.
  • Depends on: A29-W2-Mon.

A29-W2-Wed (2026-06-03) — Working session with Agent #28 on CRO Q&A bank

  • Done when: CRO-grade Q&A captured + integrated into 02-bank-demo.md.
  • Output: PR contribution.
  • Verify: 10+ CRO questions answered.
  • Reviewer: Agent #28.
  • Depends on: A29-W2-Tue.

A29-W2-Thu (2026-06-04) — Demo Scene 4 (breach simulation) review with Agent #45

  • Done when: Scene 4 script reviewed; corner cases captured.
  • Output: review comments.
  • Verify: legal disclaimer + DPDP §2(t) reference confirmed.
  • Reviewer: Agent #45.
  • Depends on: A29-W2-Wed.

A29-W2-Fri (2026-06-05) — Phase 0 PM sign-off + status post

  • Done when: PM section of Phase 0 exit green.
  • Output: row in Phase 0 exit doc.
  • Verify: 6 bank intel packs + pain-points v1.1.
  • Reviewer: Agent #28.
  • Depends on: A29-W2-Thu.

Week 3 (2026-06-08 → 2026-06-12)

A29-W3-Mon (2026-06-08) — Sprint 1 BFSI kickoff + outreach calendar

  • Done when: per-bank outreach calendar drafted for weeks 13–14.
  • Output: docs/product/bfsi-outreach-calendar.md.
  • Verify: 6 banks scheduled.
  • Reviewer: Agents #28, #42.
  • Depends on: A28-W3-Mon.

A29-W3-Tue (2026-06-09) — Pain-points v1.2 with field-research increments

  • Done when: 3 new bank conversations folded into pain-point doc.
  • Output: PR.
  • Verify: every increment cited.
  • Reviewer: Agent #28.
  • Depends on: A29-W3-Mon.

A29-W3-Wed (2026-06-10) — Cross-line architecture sync attendance

  • Done when: sync attended.
  • Output: sync notes contribution.
  • Verify: notes published.
  • Reviewer: Agent #28.
  • Depends on: A29-W3-Tue.

A29-W3-Thu (2026-06-11) — Bank-pitch deck v1 review (with Agent #48)

  • Done when: deck reviewed; pain-point coverage confirmed.
  • Output: deck comments.
  • Verify: pitch matches pain-points doc.
  • Reviewer: Agent #48.
  • Depends on: A29-W3-Wed.

A29-W3-Fri (2026-06-12) — Status post + first-demo-invitation drafts

  • Done when: invitations to top-3 banks drafted.
  • Output: docs/product/first-demo-invitations.md.
  • Verify: 3 invitations + legal LoI review pending.
  • Reviewer: Agents #28, #42, #45.
  • Depends on: A29-W3-Thu.

Week 4 (2026-06-15 → 2026-06-19)

A29-W4-Mon (2026-06-15) — Legal LoI template review (with Agent #42)

  • Done when: LoI template legally reviewed; ready for first demo follow-ups.
  • Output: signed-off template.
  • Verify: external legal review attached.
  • Reviewer: Agent #42.
  • Depends on: A29-W3-Fri.

A29-W4-Tue (2026-06-16) — Demo invitation drafts sent to Agents #43, #44 for personalisation

  • Done when: drafts handed off; per-bank personalisation steps documented.
  • Output: handover notes.
  • Verify: each AE has their 3 invitations.
  • Reviewer: Agents #43, #44.
  • Depends on: A29-W4-Mon.

A29-W4-Wed (2026-06-17) — Cross-line architecture sync attendance + demo runbook contribution

  • Done when: scene narrative refinements based on PM judgement.
  • Output: contribution to docs/operations/anchor-bank-demo-runbook.md.
  • Verify: PM voice present in operator script.
  • Reviewer: Agent #45.
  • Depends on: A29-W4-Tue.

A29-W4-Thu (2026-06-18) — Sprint 1 PM sign-off

  • Done when: BFSI PM section of S1 exit gate green.
  • Output: row in S1 exit doc.
  • Verify: pain-points v1.2 + invitations + LoI ready.
  • Reviewer: Agent #28.
  • Depends on: A28-W4-Thu.

A29-W4-Fri (2026-06-19) — Sprint 2 self-plan + status post

  • Done when: sprint-2 daily tickets drafted (demo execution support, post-demo follow-ups).
  • Output: docs/product/a29-sprint-2-plan.md.
  • Verify: 5 daily tickets.
  • Reviewer: Agent #28.
  • Depends on: A29-W4-Thu.