Skip to main content

Agent #28 — Chief Product Officer

Reports to: Founder. Mandate: Owns product roadmap, vertical prioritisation, design partner program. KPIs: see role 28 in ../03-team.md.


Week 1 (2026-05-25 → 2026-05-29)

A28-W1-Mon (2026-05-25) — Phase 0 kickoff co-sign with Agent #1

  • Done when: kickoff brief co-signed; product priorities reaffirmed (BFSI first).
  • Output: signature on docs/team/announcements/2026-05-25-phase-0-kickoff.md.
  • Verify: brief published.
  • Reviewer: Agent #1.
  • Depends on: A01-W1-Mon.

A28-W1-Tue (2026-05-26) — Anchor Bank demo prioritisation with Agent #42

  • Done when: final list of 6 target banks confirmed for Phase 2 demos.
  • Output: docs/product/anchor-bank-target-list.md.
  • Verify: 6 banks with priority ranking.
  • Reviewer: Agent #42.
  • Depends on: A28-W1-Mon.

A28-W1-Wed (2026-05-27) — Pain-points doc v1.0 review (01-pain-points.md)

  • Done when: doc reviewed end-to-end; gaps flagged.
  • Output: review comments + edits.
  • Verify: every pain has a cost number + ZeroAuth mechanism.
  • Reviewer: Agent #29.
  • Depends on: A28-W1-Tue.

A28-W1-Thu (2026-05-28) — Bank-demo spec review (02-bank-demo.md)

  • Done when: doc reviewed; scene-by-scene exit gate confirmed.
  • Output: review comments.
  • Verify: every scene has clear acceptance.
  • Reviewer: Agent #45.
  • Depends on: A28-W1-Wed.

A28-W1-Fri (2026-05-29) — Status post + 50-person roster review

  • Done when: 03-team.md reviewed; gaps identified.
  • Output: review comments.
  • Verify: every role has a mandate + KPIs.
  • Reviewer: Agents #1, #42.
  • Depends on: A28-W1-Thu.

Week 2 (2026-06-01 → 2026-06-05)

A28-W2-Mon (2026-06-01) — Pain-points v1.1 sign-off

  • Done when: v1.1 with industry-analyst-validated numbers signed off.
  • Output: signature row.
  • Verify: numbers cited.
  • Reviewer: Agent #29.
  • Depends on: A28-W1-Wed.

A28-W2-Tue (2026-06-02) — Healthcare vertical Phase 2 deferral confirmation

  • Done when: deferral memo distributed to Agents #30, #42, #36.
  • Output: docs/product/healthcare-deferral-memo.md.
  • Verify: scope captured + revisit date in phase 2.
  • Reviewer: Agents #30, #42.
  • Depends on: A28-W2-Mon.

A28-W2-Wed (2026-06-03) — Bank-PM working session (Agent #29) — CRO Q&A bank

  • Done when: 60-min session; Q&A bank for CRO-level questions drafted.
  • Output: contribution to 02-bank-demo.md Q&A.
  • Verify: 10+ CRO-grade questions answered.
  • Reviewer: Agent #29.
  • Depends on: A28-W2-Tue.

A28-W2-Thu (2026-06-04) — Anchor Bank scene 1+2 design-partner spec review with Agent #45

  • Done when: SA-grade walkthrough done.
  • Output: walkthrough notes.
  • Verify: scene 1 + 2 readiness assessed.
  • Reviewer: Agent #45.
  • Depends on: A28-W2-Wed.

A28-W2-Fri (2026-06-05) — Phase 0 product sign-off + status post

  • Done when: product sign-off row on Phase 0 exit doc.
  • Output: row.
  • Verify: pain-points + demo-spec docs current.
  • Reviewer: Agent #1.
  • Depends on: A28-W2-Thu.

Week 3 (2026-06-08 → 2026-06-12)

A28-W3-Mon (2026-06-08) — Sprint 1 product kickoff (with Agents #29, #30, #31)

  • Done when: PM team sprint priorities confirmed.
  • Output: docs/product/sprint-1-product-priorities.md.
  • Verify: every PM has 5 daily tickets.
  • Reviewer: Agent #1.
  • Depends on: A01-W3-Mon.

A28-W3-Tue (2026-06-09) — Pain-points doc v1.2 review (post-research)

  • Done when: review with industry validation cycles applied.
  • Output: review comments.
  • Verify: at least 2 new analyst sources cited.
  • Reviewer: Agent #29.
  • Depends on: A28-W3-Mon.

A28-W3-Wed (2026-06-10) — Cross-line architecture sync attendance

  • Done when: sync attended; product surface aligned with engineering priorities.
  • Output: sync notes contribution.
  • Verify: notes published.
  • Reviewer: Agent #1.
  • Depends on: A28-W3-Tue.

A28-W3-Thu (2026-06-11) — Bank-pitch deck v1 review with Agent #48

  • Done when: deck reviewed; messaging aligned with pain-points doc.
  • Output: deck v1 + comments.
  • Verify: messaging consistent.
  • Reviewer: Agent #48.
  • Depends on: A28-W3-Wed.

A28-W3-Fri (2026-06-12) — Status post + mid-sprint product health

  • Done when: PM statuses read.
  • Output: docs/product/s1-mid-product-health.md.
  • Verify: 4 PM statuses logged.
  • Reviewer: Agent #1.
  • Depends on: A28-W3-Thu.

Week 4 (2026-06-15 → 2026-06-19)

A28-W4-Mon (2026-06-15) — Demo runbook draft sign-off (precursor C-190)

  • Done when: scene-by-scene runbook draft reviewed.
  • Output: review comments on docs/operations/anchor-bank-demo-runbook.md.
  • Verify: every scene runs in script.
  • Reviewer: Agents #29, #45, #35.
  • Depends on: A28-W3-Fri.

A28-W4-Tue (2026-06-16) — Healthcare pain-point draft initial review (with Agent #30)

  • Done when: draft reviewed; ABDM angle captured.
  • Output: review comments.
  • Verify: draft current state captured.
  • Reviewer: Agent #30.
  • Depends on: A28-W4-Mon.

A28-W4-Wed (2026-06-17) — Cross-line architecture sync attendance + first-demo invitation drafts

  • Done when: draft invitations to top-3 banks reviewed.
  • Output: contribution to invitations.
  • Verify: tone + content aligned with pain-points.
  • Reviewer: Agents #29, #43, #44.
  • Depends on: A28-W4-Tue.

A28-W4-Thu (2026-06-18) — Sprint 1 product exit-gate sign-off

  • Done when: product section of S1 exit gate green.
  • Output: row in S1 exit doc.
  • Verify: PM deliverables current; demo runbook draft ready.
  • Reviewer: Agent #1.
  • Depends on: A01-W4-Thu.

A28-W4-Fri (2026-06-19) — Sprint 2 dispatch + Friday status read

  • Done when: sprint-2 daily tickets generated for Agents #29, #30, #31.
  • Output: docs/product/sprint-2-daily-dispatch.md.
  • Verify: each PM has 5 daily tickets.
  • Reviewer: Agent #1.
  • Depends on: A28-W4-Thu.