Agent #5 — VP Engineering, Infrastructure / SRE

Reports to: Agent #1. Mandate: Owns VPS infrastructure, Docker stack, Caddy reverse proxy, deploy pipeline, CVE response, observability. KPIs: see role 5 in ../03-team.md.


Week 1 (2026-05-25 → 2026-05-29)

A05-W1-Mon (2026-05-25) — Infra team kickoff + observability inventory

  • Done when: existing telemetry surfaces inventoried (Winston logs, Caddy access, Postgres slow query log, Docker stats).
  • Output: docs/team/infra/observability-inventory.md.
  • Verify: inventory covers all 4 telemetry sources.
  • Reviewer: Agent #1, Agent #21, Agent #22.
  • Depends on: A01-W1-Mon.

A05-W1-Tue (2026-05-26) — Co-design pre-commit hook + CI mirror with Agent #22

  • Done when: hook spec + CI-mirror spec aligned.
  • Output: docs/team/infra/pre-commit-spec.md.
  • Verify: covers all 7 violation patterns in 06-ways-of-working.md.
  • Reviewer: Agent #22.
  • Depends on: A05-W1-Mon.

A05-W1-Wed (2026-05-27) — Review C-001 (pre-commit hook PR)

  • Done when: PR reviewed; CI mirror step pre-commit-mirror confirmed.
  • Output: PR comment on C-001.
  • Verify: scripts/test-pre-commit.sh green.
  • Reviewer: Agent #1.
  • Depends on: A05-W1-Tue.

A05-W1-Thu (2026-05-28) — Secret-rotation calendar drafted

  • Done when: JWT, SESSION, ADMIN, BLOCKCHAIN secrets each have a quarterly rotation date.
  • Output: docs/team/infra/secret-rotation-calendar.md.
  • Verify: calendar entries scheduled in Google Calendar with infra-on-call invited.
  • Reviewer: Agent #12.
  • Depends on: A05-W1-Wed.

A05-W1-Fri (2026-05-29) — Friday status + deploy-pipeline audit kickoff

  • Done when: Agent #21, Agent #22 statuses read; deploy-pipeline audit started.
  • Output: docs/team/infra/deploy-pipeline-audit-w1.md.
  • Verify: workflow inventory + step-level review begun.
  • Reviewer: Agent #1.
  • Depends on: A05-W1-Thu.

Week 2 (2026-06-01 → 2026-06-05)

A05-W2-Mon (2026-06-01) — Co-design anchor-job cron with Agent #21

  • Done when: CronCreate-managed daily anchor schedule reviewed; 00:30 IST confirmed; failure-alert path agreed.
  • Output: docs/team/infra/anchor-job-spec.md.
  • Verify: spec referenced by C-015 PR.
  • Reviewer: Agent #21, Agent #25.
  • Depends on: A05-W1-Fri.

A05-W2-Tue (2026-06-02) — Review C-015 (anchor-job cron)

  • Done when: PR reviewed; alert wiring confirmed.
  • Output: PR comment on C-015.
  • Verify: tests/anchor-job.test.ts green against Hardhat fork.
  • Reviewer: Agent #25.
  • Depends on: A05-W2-Mon.

A05-W2-Wed (2026-06-03) — Review C-032 (CVE monitor workflow)

  • Done when: workflow reviewed; dry-run alert delivered to security mailing list.
  • Output: PR comment on C-032.
  • Verify: dry-run workflow run link recorded.
  • Reviewer: Agent #22, Agent #26.
  • Depends on: C-032 opened.

A05-W2-Thu (2026-06-04) — Metric pipeline plan

  • Done when: metric sinks chosen (Prometheus + Grafana or hosted equivalent); verifier-latency + audit-write-lag + anchor-lag metrics specced.
  • Output: docs/team/infra/metric-pipeline-plan.md.
  • Verify: each of 3 metrics has source, sink, dashboard, alert thresholds.
  • Reviewer: Agent #21.
  • Depends on: A05-W2-Wed.

A05-W2-Fri (2026-06-05) — Phase 0 infra exit sign-off + status read

  • Done when: infra section of Phase 0 exit gate green.
  • Output: docs/team/phase-exits/phase-0-infra-signoff.md.
  • Verify: pre-commit hook + CVE monitor live; secret-rotation calendar published.
  • Reviewer: Agent #1.
  • Depends on: A05-W2-Thu.

Week 3 (2026-06-08 → 2026-06-12)

A05-W3-Mon (2026-06-08) — SLA monitoring stack provisioning in test env

  • Done when: Grafana dashboard live in test env with 3 metric panels.
  • Output: dashboard URL recorded in docs/team/infra/grafana-dashboards.md.
  • Verify: panels populated with at least 24 h of data by Friday.
  • Reviewer: Agent #21.
  • Depends on: A05-W2-Thu.

A05-W3-Tue (2026-06-09) — Device-fleet CI runner plan

  • Done when: physical-device-farm CI runner architecture documented (Firebase Test Lab vs local fleet vs BrowserStack-Android).
  • Output: docs/team/infra/device-fleet-runner-plan.md.
  • Verify: vendor short-list + cost comparison + 2-vendor PoC plan.
  • Reviewer: Agent #4, Agent #21, Agent #24.
  • Depends on: A05-W3-Mon.

A05-W3-Wed (2026-06-10) — Cross-line architecture sync attendance

  • Done when: sync attended; mobile CI runner integration confirmed for sprint 2.
  • Output: sync notes contribution.
  • Verify: notes published.
  • Reviewer: Agent #1.
  • Depends on: A05-W3-Tue.

A05-W3-Thu (2026-06-11) — Load-test infra scaffolding (precursor to C-191)

  • Done when: k6 runner infra in test env stood up; smoke load test executed.
  • Output: docs/team/infra/load-test-bootstrap.md.
  • Verify: smoke 10 RPS for 60 s green.
  • Reviewer: Agent #23.
  • Depends on: A05-W3-Wed.

A05-W3-Fri (2026-06-12) — Friday status + mid-sprint infra health

  • Done when: 2 infra agent statuses read; risks logged.
  • Output: docs/team/infra/s1-mid-health.md.
  • Verify: risks colour-coded; alerting wired.
  • Reviewer: Agent #1.
  • Depends on: A05-W3-Thu.

Week 4 (2026-06-15 → 2026-06-19)

A05-W4-Mon (2026-06-15) — Incident-response runbook v1

  • Done when: runbook drafted with severity grid + escalation tree + on-call rota.
  • Output: docs/operations/incident-response-runbook.md.
  • Verify: cross-references 06-ways-of-working.md escalation matrix.
  • Reviewer: Agent #21, Agent #40.
  • Depends on: A05-W3-Fri.

A05-W4-Tue (2026-06-16) — Test deploy on staging environment

  • Done when: full deploy pipeline executed on staging; rollback exercise dry-run completed.
  • Output: docs/team/infra/staging-deploy-2026-06-16.md.
  • Verify: rollback exercise log captured; MTTD measured.
  • Reviewer: Agent #21.
  • Depends on: A05-W4-Mon.

A05-W4-Wed (2026-06-17) — Observability dashboards finalised

  • Done when: 3 production-quality dashboards (verifier latency, audit-write lag, anchor lag) live + linked from on-call runbook.
  • Output: dashboard URLs in docs/team/infra/grafana-dashboards.md.
  • Verify: each dashboard has 7-day backfill.
  • Reviewer: Agent #21.
  • Depends on: A05-W4-Tue.

A05-W4-Thu (2026-06-18) — Sprint 1 infra exit sign-off

  • Done when: infra section of S1 exit gate green.
  • Output: docs/team/sprint-exits/s1-infra.md.
  • Verify: dashboards + runbook + CI device runner spec all referenced.
  • Reviewer: Agent #1.
  • Depends on: A01-W4-Thu.

A05-W4-Fri (2026-06-19) — Sprint 2 dispatch + status read

  • Done when: sprint-2 daily tickets generated for Agents #21, #22.
  • Output: docs/team/infra/sprint-2-daily-dispatch.md.
  • Verify: each agent has 5 daily tickets for week 5.
  • Reviewer: Agent #1.
  • Depends on: A05-W4-Thu.