Enterprise risk register — v1

Status: v1 — first issue, baseline of 10 enterprise risks. Owner: Agent #40 (Risk & Audit Lead). Reviewer: Agent #36 (Chief Compliance Officer). Sign-off authority for residual >= 13: Agent #1 (founder / CTO) plus Agent #28 (founder / product, in his Pulkit-Amit founder role on the roadmap). At the time of v1 issue no risk exceeds the auto-accept band after mitigation.

Companion documents:


1. Purpose​

This register is the enterprise-level view of the risks ZeroAuth faces as a going concern: commercial, operational, regulatory, strategic and high-blast-radius security risks that would degrade the company's ability to deliver the BFSI v1 roadmap or to sustain a customer base once delivered. It is distinct from docs/threat_model.md, which is the technical attack catalogue (A-NN rows) tracking spoofing, replay, tampering, elevation-of-privilege and similar attack vectors at the protocol layer.

The two documents are linked: technical attacks ladder up to enterprise risks. A successful replay of a captured proof (A-02) does not in itself sink the company, but a pattern of unmitigated A-02 incidents materialises R-ENT-02 (supply-chain) and R-ENT-03 (DPDP §8 breach) depending on root cause. Each enterprise risk row therefore references the threat-model A-NN entries that contribute to it.

What changed since the threat model: the threat model is exhaustive at the attack-vector level — every endpoint, every payload field, every write surface. This register is exhaustive at the enterprise level — the risks that the founder, the CCO, the CRO and the board carry on their dashboard. Threat model has many rows; the register has ten.

Audience: Agent #1 (founder/CTO), Agent #28 (founder/product), Agent #36 (CCO), Agent #42 (CRO), Agent #40 (Risk & Audit), and the regulator or auditor reading our governance evidence pack.

Cadence: see §4. Re-assessment is event-driven (see §6 operating principles) on top of the calendar cadence.


2. Risk classification​

The classification grid is the same across enterprise risks and the technical threat-model rows that ladder up to them, so a single language holds end to end.

2.1 Likelihood (L)​

ScoreLabelPlain-English meaning
1rareExpected once in 10 years or longer. No precedent in the team's experience.
2unlikelyExpected once in 3–10 years. Has happened to peer companies but not to us.
3possibleExpected once in 1–3 years. Has happened in adjacent industries or in early demos.
4likelyExpected at least once in the next 12 months. Active controls keep it from being routine.
5almost-certainExpected multiple times in 12 months unless a hard mitigation lands.

2.2 Impact (I)​

ScoreLabelPlain-English meaning
1insignificantLocal inconvenience; absorbed by existing on-call rotation in under a day.
2minorA sprint of remediation work; no customer-visible degradation beyond a hours-scale outage.
3moderateA pilot bank pauses; one quarterly milestone slips by up to 4 weeks. No regulator notification.
4majorA signed pilot terminates, or a Phase exit gate slips by 8+ weeks, or a regulator opens correspondence.
5catastrophicExistential — the company is unable to operate as a BFSI vendor; or DPDP §8 breach with > 10 000 data principals affected; or RBI notice; or founder dismissal.

2.3 Inherent risk (L × I)​

The product L × I is the inherent risk score, computed before any mitigation is applied. Range 1..25.

2.4 Residual risk (L_residual × I_residual)​

After mitigations land, both likelihood and impact may drop. The residual risk is computed against the after-mitigation values. The target for v1 is that every residual sits in the low-amber band (<= 6) or has explicit sign-off from Agent #1 + Agent #28.

2.5 Risk appetite​

Residual bandVerdictAction
1–6low-amberAuto-accept. Recorded in this register. Reviewed quarterly.
7–12mid-amberReview required by Agent #36 (CCO) and Agent #1 (CTO). Mitigation roadmap mandatory. Reviewed monthly.
13–25redHard-stop. No new pilot signed, no new release shipped, until either residual drops below 13 or the founders explicitly sign off (Agent #1 + Agent #28) with a documented mitigation timeline.

The threshold lines are deliberately tight: a 4×4=16 inherent that drops to 3×2=6 residual is acceptable; a 4×4=16 that drops only to 3×4=12 is mid-amber and gets monthly attention.


3. The 10 enterprise risks​

Each row carries: identifier, title, class, description, inherent L×I, mitigations (numbered, testable), residual L×I, owner agent #, review cadence, last-reviewed date, threat-model row references, residual sign-off.

R-ENT-01 — Concentration risk: single BFSI vertical, single market (India)​

FieldValue
ClassCommercial
DescriptionThe BFSI v1 plan stakes 12 months on Indian banks as the only revenue-bearing vertical. A single regulatory shift (RBI tightening third-party-vendor governance), a single market-wide downturn (CRR change starving bank IT budgets), or a single competitive entrant (a domestic incumbent bundles identity verification into a core banking suite) materially degrades the company's commercial trajectory. Healthcare and Web3 are deferred to Phase 2+, so for ~26 weeks ZeroAuth has no diversification cushion.
Inherent L × I4 × 4 = 16
Mitigations(1) Horizontal expansion to healthcare in Phase 2 (compliance-roadmap-v1 §3.3 Q3 milestones name the second-vertical demo). (2) GCC pilot scoping in Phase 4 — see compliance-roadmap-v1 §3.4 Q4 placeholder. (3) Target recurring-revenue mix > 80 % so loss of any single bank does not terminate the company (KPI tracked by Agent #42). (4) Identify two cohorts in flight at the RBI sandbox (R-COMP-05 mitigation in compliance roadmap) so we keep an open regulator door. (5) Maintain a quarterly "vertical-readiness" memo by Agent #28 + Agent #42 logging the second- and third-vertical option value.
Residual L × I3 × 2 = 6
OwnerAgent #42 (CRO). Co-owner: Agent #28 (founder/product).
Review cadenceQuarterly with Agent #36 + Agent #1, plus on any of the §6 event triggers.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsNone directly — this is a commercial risk, not a protocol attack. Indirectly, A-09 (console JWT theft) and A-13 (session fixation in pairing) magnify the impact if they coincide with a single-bank concentration event.
Residual sign-offAgent #42 (auto-accept at residual 6).

R-ENT-02 — Supply-chain attack via npm / Gradle / cargo dependency​

FieldValue
ClassSecurity
DescriptionA direct or transitive dependency in package.json, mobile/build.gradle, the IoT firmware Cargo crates, the Hardhat contract deps, or the snarkjs/circomlib chain is compromised. The compromise injects code that exfiltrates the BLOCKCHAIN_PRIVATE_KEY, the JWT_SECRET, the API-key plaintext seen at issuance, or the biometricSecret in the prover. Same class as event-stream, ua-parser-js, xz-utils 2024 backdoor.
Inherent L × I3 × 4 = 12
Mitigations(1) Nightly CVE monitor running in CI (commit f8a756c on .github/workflows/cve-monitor.yml) with high-severity alerts routed to the on-call channel — verifiable by inspecting the workflow run history. (2) dep-add ADR-first policy (CLAUDE.md §6 + ADR /adr/0000-grandfather-initial-deps.md baseline) plus scripts/check-dep-trail.sh blocking merge when a dep lacks an ADR — verifiable by triggering a no-ADR PR and asserting CI fails. (3) Signed-only releases on Phase 3 SBOM (compliance-roadmap-v1 §3.3 Q3 milestones) — verifiable by checking provenance: true on the GitHub Actions release attestation when Phase 3 work completes. (4) Lockfile review gate in CI — package-lock.json diffs > 100 lines are routed for human review; verifiable by a dependent PR that exceeds the threshold. (5) WebView snarkjs bundling with SHA-256 pinning per ADR 0010 closes the runtime-CDN class of supply-chain attack on the prover (A-17).
Residual L × I2 × 3 = 6
OwnerAgent #26 (Application Security Engineer). Co-owners: Agent #21 (DevOps/SRE) for the CI gates and Agent #40 (Risk & Audit) for the policy.
Review cadenceMonthly. Friday SBOM dump reviewed weekly during release windows.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsA-17 (WebView snarkjs supply-chain), A-24 (side-channel during proof generation — partially material to a hardened-prover dep). New A-NN required if a non-prover supply-chain attack vector materialises.
Residual sign-offAgent #26 (auto-accept at residual 6).

R-ENT-03 — DPDP §8 reportable breach incident​

FieldValue
ClassRegulatory
DescriptionA personal-data breach that meets the DPDP Act 2023 §8 reporting threshold — i.e., processing failure that materially affects the rights of data principals — must be notified to the Data Protection Board of India and to affected principals within 72 hours of discovery. A breach of bank-onboarded user records, a misrouted audit-event export, or a leaked Postgres backup falls in this class. Penalties under §33 can reach INR 250 crore per incident.
Inherent L × I3 × 5 = 15
Mitigations(1) DPO breach-notification SOP at docs/compliance/dpdp/breach-notification-sop-v0.md (planned A37-W?? deliverable per agent-37 plan; v0 lives by Phase 0 exit). Verifiable by quarterly tabletop (first tabletop Q3 wk 33 per compliance-roadmap-v1 §3.3). (2) Hash-chained audit log (commit a475ed8 on src/services/audit.ts, per ADR 0013) gives a cryptographic record of every write surface, supporting forensics within the 72-hour window. Verifiable by replay via /api/admin/audit-integrity. (3) Per-tenant on-chain anchors per ADR 0014 make the audit chain externally verifiable, so a regulator can confirm scope without trusting any ZeroAuth process. (4) DPDP §2(t) commitments memo v0 argues that the Poseidon commitment and DID are not personal data, limiting the reportable surface area to the genuine PII (email, tenant company name, lead form fields per data-inventory-v1 §3.1, §3.2). (5) Data inventory v1 explicitly classifies every data element so the breach scoping in the 72-hour window is a lookup, not a derivation.
Residual L × I2 × 3 = 6
OwnerAgent #37 (Compliance / DPDP & RBI Lead). Co-owners: Agent #36 (CCO) for the regulator interface and Agent #41 (DPO) for the principal-side notifications.
Review cadenceMonthly. After any incident classified as severity-2 or worse the review goes interim.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsA-22 (PII in pairing logs), A-28 (JWT-in-URL log leak, CLOSED), A-09 (console JWT theft via XSS), A-10 (dashboard requests leaking another tenant's data), A-21 (audit-log tampering for pairing events).
Residual sign-offAgent #37 (auto-accept at residual 6).

R-ENT-04 — Key compromise: trusted-setup ceremony bad actor​

FieldValue
ClassSecurity / Cryptographic
DescriptionThe Phase 2 trusted-setup ceremony for identity_proof v1.2 (and successor versions) produces the proving/verification keys. If every contributor colludes — or the coordinator runs a solo setup and the team accepts the artefact uninspected — the toxic waste is recoverable and the holder can forge accepted proofs against any tenant's commitments indefinitely. Until detected this destroys the verification guarantee at the heart of the product.
Inherent L × I2 × 5 = 10
Mitigations(1) Six (>= 6) contributors with the at-least-one-honest assumption (trusted-setup-ceremony.md §1.4 + §2.2). Verifiable by inspecting the contributor list in docs/team/crypto/trusted-setup-contributors.md and the chained transcripts in circuits/ceremony-transcripts/v1.2/. (2) External attestor: an external cryptographer (not on ZeroAuth payroll and not from any contributor's employer) re-verifies offline post-ceremony and publishes a PGP-signed attestation.pdf. Verifiable by checking the PGP signature in the published transcript bundle. (3) Public transcripts: every contribution hash and the final beacon round are published with sources; any third party can replay-verify. (4) The on-chain Groth16Verifier is the verifiable artefact — its bytecode is on Base Sepolia (Phase 0–3) and Base mainnet (Phase 4) and is checked against the local artefact via bytecode-equivalence verification on deploy (R-ENT-08 mitigation #4). (5) Selection rules (>= 2 external, no shared employer, no shared laptop+OS combo) reduce the realistic collusion surface.
Residual L × I1 × 4 = 4
OwnerAgent #11 (Senior Cryptography Engineer — circuit + prover, coordinator). Co-owners: Agent #27 (Cryptographer-Reviewer subagent owner) for the external-attestor relationship and Agent #40 (Risk & Audit) for ceremony-day governance.
Review cadencePer ceremony (v1.2 in Phase 1 wk 10; successor versions per ADR 0015). Quarterly between ceremonies.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsNone directly today — the threat model treats proof verification (A-02), not key-genesis. A new A-NN entry "forged proof via setup compromise" is queued for the threat-model bump that lands with the v1.2 circuit.
Residual sign-offAgent #11 (auto-accept at residual 4).

R-ENT-05 — Vendor lock-in / lapse​

FieldValue
ClassOperational
DescriptionZeroAuth depends on a small set of external SaaS vendors: GitHub Enterprise Cloud (code + CI), Sentry (error reporting, scrubbed), Cloudflare (TLS termination on marketing site), 1Password (secrets), Google Workspace (SSO + corporate IT), the eventual evidence collector (Drata / Vanta / Sprinto), the eventual bug bounty platform (HackerOne / BugCrowd), and the eventual HSM vendor (Phase 4). A unilateral price hike, an account suspension, an export-control change, or a vendor going dark each interrupts compliance evidence collection, deploy ability, or breach-response readiness.
Inherent L × I3 × 3 = 9
Mitigations(1) Annual vendor review owned by Agent #50 (Operations) per the agent-50 plan; recorded in docs/compliance/vendors/<vendor>/annual-review-<year>.md. Verifiable by inspecting the directory. (2) DPA on file per vendor — see compliance-roadmap-v1 §1.3 ("each covered by a DPA on file"). Verifiable by checking the off-repo evidence pack hash reference in docs/compliance/evidence-pack/<year>-<q>/. (3) RBI Phase-3 outsourcing-policy alignment — RBI MD on IT Governance §10 (third-party risk) requires the bank to inspect our vendor management; the inspection-readiness checklist (compliance-roadmap-v1 §2.2) captures the cross-reference. (4) Reserve fund earmarked by Agent #50 covers replacement procurement up to 90 days of operating costs. Verifiable in the budget tracker. (5) Pre-evaluated in-country alternatives for each cross-border processor (compliance-roadmap-v1 §7.8 R-COMP-08 mitigation: docs/compliance/dpdp/cross-border-fallbacks.md) so a DPDP §13 tightening or a vendor lapse triggers a documented swap-out rather than improvisation.
Residual L × I2 × 2 = 4
OwnerAgent #50 (Operations / Office Manager). Co-owners: Agent #36 (CCO) for DPA compliance and Agent #21 (DevOps/SRE) for CI/CD-bearing vendors.
Review cadenceQuarterly vendor review (Q2 wk 26, Q3 wk 39, Q4 wk 52 per compliance-roadmap-v1 §4).
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsNone directly. Adjacent: A-17 (WebView snarkjs supply-chain) treats the vendor risk for a specific runtime artefact.
Residual sign-offAgent #50 (auto-accept at residual 4).

R-ENT-06 — Key person dependency​

FieldValue
ClassStrategic
DescriptionA small team (50 agents per docs/plan/bfsi-v1/03-team.md, with several "of-one" roles) means several functions have a single named owner. If Agent #1 (founder/CTO), Agent #11 (lead cryptography), Agent #12 (key management), Agent #25 (lead smart-contract engineer) or Agent #36 (CCO) leaves, falls ill, or otherwise becomes unavailable for > 2 weeks, the corresponding work stream stalls. The cryptographic and on-chain functions are especially exposed because the knowledge density is high and the load-bearing decisions live in their heads.
Inherent L × I3 × 4 = 12
Mitigations(1) Every load-bearing role has a documented secondary owner per docs/plan/bfsi-v1/03-team.md — secondaries listed explicitly in the role rows. Verifiable by grepping Secondary: in 03-team.md. (2) ADR-driven architecture: every load-bearing decision is captured in /adr/ so reconstructing the rationale does not require the original author (see ADRs 0009..0016 for the Phase 0 + 1 hot path). Verifiable by reading any ADR cold. (3) Key-management practices that do not depend on a single human — Phase 3 HSM-backed signer (compliance-roadmap-v1 §3.4 Q4 wk 48 D-Q4-06) replaces the BLOCKCHAIN_PRIVATE_KEY-in-.env posture so contract ownership rotation is procedural, not heroic. Verifiable by inspecting the HSM cutover runbook and the on-chain owner change. (4) Cross-training: every agent's secondary attends the primary's standup once per sprint; recorded in docs/team/cross-training-log.md. (5) Founders carry duplicate signing authority on contracts and on regulator filings, so neither founder is a single point of failure on the legal surface.
Residual L × I2 × 3 = 6
OwnerAgent #1 (founder / CTO). Co-owners: Agent #36 (CCO) for governance and Agent #50 (Operations) for HR continuity.
Review cadenceQuarterly. Re-assessed within 7 days of any agent moving role or leaving.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsNone directly. Adjacent: A-07 (leaked deployer wallet private key) becomes harder to mitigate when the named key holder is unavailable.
Residual sign-offAgent #1 (auto-accept at residual 6).

R-ENT-07 — Ceremony / circuit-version slip​

FieldValue
ClassOperational
DescriptionThe Phase 2 trusted-setup ceremony is on the critical path for the Anchor Bank demo (Phase 1 exit, wk 12) and for ISO 27001 Annex A.5.31 evidence (ISO Stage 2, wk 36). A ceremony slip — coordinator unavailable, contributor pool incomplete, ptau file integrity check failure — propagates downstream. A v1.2 → v1.3 circuit bump mid-pilot would compound the slip with a re-issuance of every tenant's pinned verification key.
Inherent L × I3 × 3 = 9
Mitigations(1) Trusted-setup runbook (docs/cryptography/trusted-setup-ceremony.md) is the operational playbook; verifiable by walking section §1..§8 and asserting each artefact exists when the ceremony day arrives. (2) Phase 1 sprint-4 buffer for the ceremony: ceremony target is wk 10, ISO Stage 2 is wk 36, so 26 weeks of contingency (compliance-roadmap-v1 §7.3 R-COMP-03). (3) cryptographer-reviewer subagent gate per ADR 0015 ensures every circuit-version bump goes through plan mode + ADR + subagent review. Verifiable by inspecting the ADR-trail script's coverage of circuits/ changes. (4) Rollback path retained: the prior verification key + pinned ptau hash kept in circuits/legacy/<prev-version>/; verifier service can be pinned to a prior version per ADR 0015 §3 "Rollback procedure." (5) Pre-coordinated calendar slot with the lead ISO auditor so the ceremony is on her calendar (compliance-roadmap-v1 §7.3).
Residual L × I2 × 2 = 4
OwnerAgent #11 (Cryptography). Co-owners: Agent #36 (CCO) for the regulator-facing knock-on and Agent #40 (Risk & Audit) for the schedule-buffer enforcement.
Review cadenceMonthly through Phase 1 (sprints 1–4); per ceremony thereafter.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsIndirect: a slip that pushes the ceremony past ISO Stage 2 reduces the assurance level for A-21 (audit-log tampering) and A-02 (proof replay) where the audit defence depends on the post-ceremony verifier going live.
Residual sign-offAgent #11 (auto-accept at residual 4).

R-ENT-08 — Contract / smart-contract bug post-deployment​

FieldValue
ClassSecurity / Financial
DescriptionThe DIDRegistry, Groth16Verifier, and AuditAnchor Solidity contracts are deployed to Base Sepolia (Phase 0–3) and Base mainnet (Phase 4). A logic bug in registerIdentity, revokeIdentity, or the audit-anchor commit path could (a) allow forged identity rows, (b) lock out a tenant from its own anchors, or (c) silently drift the anchored hash from the off-chain truth. Once mainnet is reached, contract upgrade paths are constrained (no proxy by deliberate choice per ADR 0014), so remediation requires a new deployment + migration.
Inherent L × I2 × 5 = 10
Mitigations(1) Hardhat test suite per contract — tests/ under contracts/test/ covers every public function with unit + scenario tests; verifiable by npx hardhat test returning green. (2) Trail of Bits (or equivalent firm) external audit before mainnet — compliance-roadmap-v1 §3.3 Q3 wk 16–24 with final report by wk 24, remediation by wk 30. Verifiable by checking the published audit report under docs/security/contract-audits/. (3) Write-once + role-gated state changes: contract storage variables for identity registry rows are private + write-only-by-owner; reads are view; no contract method permits mass deletion. Verifiable by running slither / mythril on the bytecode. (4) Bytecode-equivalence verification post-deploy: deploy script computes the local hash of the compiled bytecode and compares against eth_getCode(contractAddress); deploy fails on mismatch. Verifiable by inspecting the deploy log. (5) The cryptographer-reviewer subagent is mandatory for any change under contracts/ (CLAUDE.md §5).
Residual L × I2 × 3 = 6
OwnerAgent #25 (Senior Smart-Contract Engineer). Co-owners: Agent #26 (Application Security Engineer) for the third-party audit relationship and Agent #36 (CCO) for the change-in-scope memo to the SOC 2 + ISO auditors when mainnet lands (compliance-roadmap-v1 §3.4 Q4 wk 46 D-Q4-04).
Review cadenceMonthly during Phase 2 (audit period); on every deploy thereafter.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsA-07 (leaked deployer wallet key) is the operational sibling. A new A-NN entry "contract-storage corruption via owner-only function bug" is queued for the threat-model update that lands with the mainnet deployment.
Residual sign-offAgent #25 (auto-accept at residual 6).

R-ENT-09 — On-chain anchor disruption (Base L2 outage / gas spike)​

FieldValue
ClassOperational
DescriptionThe daily on-chain anchor of the audit-chain head (ADR 0014) requires a working Base L2 RPC endpoint and reasonably low gas. A Base outage (sequencer downtime, RPC provider DDoS), a gas-price spike above the configured ceiling, or a wallet-balance shortage interrupts anchor delivery. While the off-chain hash chain remains intact, the bank's auditor sees an "anchor-lagged" tenant state in the dashboard and may flag it during inspection.
Inherent L × I3 × 3 = 9
Mitigations(1) Three redundant Base RPC providers per ADR 0014 — Alchemy, Infura, Coinbase (or current equivalents). Failover order is configured; verifiable by inducing a 503 on the primary and asserting the secondary fires. (2) Retry-with-backoff in the anchor cron (src/services/blockchain.ts) — up to 6 retries over 4 hours; verifiable by integration test. (3) The off-chain hash chain remains intact regardless of anchor delivery — every audit row carries previous_hash + event_hash; the chain is replay-verifiable via /api/admin/audit-integrity even when the on-chain anchor is days stale. (4) An "anchor-degraded" tenant state in the dashboard, surfaced via IntegrityCheckCard and /api/admin/audit-integrity (ADR 0013, commits a475ed8 and follow-ups). The state is transparent to the bank's auditor — a degraded badge with a "stale since" timestamp, not a hidden failure. (5) Gas-ceiling alerting: if the next anchor would exceed the configured ceiling (default 5 gwei), the cron emits a pricing_breach audit event and pages on-call rather than firing the transaction blindly.
Residual L × I2 × 2 = 4
OwnerAgent #25 (Smart-Contract Engineer) for the on-chain path. Co-owners: Agent #21 (DevOps/SRE) for the RPC redundancy and Agent #40 (Risk & Audit) for the SLA.
Review cadenceMonthly. Per-incident review on any 24-hour-or-longer anchor lag.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsA-21 (audit-log tampering) — the on-chain anchor is one of the five mitigations on A-21, so anchor disruption raises the residual on A-21 until the anchor catches up.
Residual sign-offAgent #25 (auto-accept at residual 4).

R-ENT-10 — Anti-money-laundering / sanctions-listed enrolment​

FieldValue
ClassRegulatory
DescriptionA bank tenant enrols an end user who is on a sanctions list (OFAC, UN, MEA) or a money-laundering watch list, and the verification event flows through ZeroAuth's pipeline. The regulator's inspection treats ZeroAuth's role as either (a) a passive infrastructure provider — the bank's responsibility — or (b) a participant in the chain — ZeroAuth's responsibility. Misclassification of role under DPDP §6 or RBI MD on KYC §44 carries direct penalties and reputational damage with all other bank prospects.
Inherent L × I2 × 5 = 10
Mitigations(1) KYC anchor at enrolment per the bank's existing screening: ZeroAuth's enrolment record references the bank's CKYC / V-CIP record ID (RBI MD on KYC §16, §44 per compliance-roadmap-v1 §2.5). Verifiable by the per-tenant attestation clause in the pilot SOW. (2) ZeroAuth does NOT do AML — the AML responsibility stays with the bank. ZeroAuth provides the verification artefact (proof + Poseidon commitment + audit row) and the integrity guarantee, not the watchlist check. The role boundary is documented at docs/compliance/aml-statement.md (planned Agent #37 deliverable in Q1; placeholder file referenced here and slot-cited in agent-37's ticket list). Verifiable by checking the existence of the document and the per-tenant DPA clause that incorporates it by reference. (3) The aml-statement.md explicitly disclaims ZeroAuth's involvement and binds the bank to perform its own AML screening before invoking ZeroAuth's verification flow. (4) Sanctioned-jurisdiction tenant config blocks origin countries: tenants.security_policy.jurisdiction_allowlist enforces a per-tenant allowlist evaluated on the clientMeta.requesterCountry header at /v1/proof-pairing/sessions and /v1/zkp/verify. Verifiable by integration test against a known-blocked country code. (5) Audit row on every enrolment captures the bank's CKYC reference ID (when supplied), so the inspection trail traces every ZeroAuth verification back to a bank-owned KYC record.
Residual L × I1 × 4 = 4
OwnerAgent #37 (DPDP & RBI Lead). Co-owners: Agent #36 (CCO) for regulator interface and Agent #41 (DPO) for principal-side communications.
Review cadencePer pilot SOW signing and per RBI MD on KYC revision. Monthly otherwise.
Last reviewed2026-05-28 (v1 issue).
Threat-model rowsA-22 (PII in pairing logs) — leakage of an enrolment with a watchlist reference materialises the regulatory class-of-harm at the protocol layer.
Residual sign-offAgent #37 (auto-accept at residual 4).

4. Risk-management cadence​

The cadence below is the floor; event triggers in §6 force interim reviews above and beyond the calendar.

4.1 Weekly — Agent #40 risk-walk​

Every Monday Agent #40 (Risk & Audit Lead) walks the register row by row, looking for:

  • Mitigations that have become testable since last walk — i.e., a commit has landed that closes a previously-aspirational mitigation. Update the "Mitigations" column with the commit hash.
  • Mitigations that have regressed — i.e., a revert or a config flip has weakened a previously-tested mitigation. Re-score residual and flag for Agent #36.
  • New threat-model A-NN rows since last walk — assign them to the enterprise risks they ladder up to.

The walk is documented in docs/compliance/risk/walks/<yyyy-mm-dd>.md on Monday afternoon. The Friday status post by Agent #40 cites the most recent walk.

4.2 Monthly — risk register review (15th of every month)​

Held on the 15th of every month, attendees:

  • Agent #1 (founder / CTO) — chair.
  • Agent #36 (Chief Compliance Officer).
  • Agent #42 (Chief Revenue Officer).
  • Agent #40 (Risk & Audit Lead) — secretary.

Agenda:

  1. Walk every mid-amber risk (residual 7–12) row by row.
  2. Spot-check two low-amber risks (residual <= 6) by rotating through the list.
  3. Review any new risks proposed since last review.
  4. Confirm risk-acceptance protocol decisions from the prior month (see §5).

Output: minutes committed to docs/compliance/risk/minutes/<yyyy-mm-15>.md within 48 hours.

4.3 Quarterly — board-level review​

Held in the last week of Q1, Q2, Q3, Q4 (target dates wk 13, 26, 39, 52 — aligned with the retrospective cadence in compliance-roadmap-v1 §3 and §8.1). Attendees:

  • Founders (Agent #1 + Agent #28).
  • Agent #36 (CCO).
  • Agent #42 (CRO).
  • Agent #40 (Risk & Audit) — secretary.
  • The board observer (when one is seated).

Agenda:

  1. Quarterly retrospective of risks materialised vs. forecast.
  2. Re-score every risk against the past quarter's facts.
  3. Approve any residual >= 13 sign-off requests.
  4. Decide any escalations to v2 of the register (new risks, new classes).

Output: board-pack row published as part of the compliance retro (compliance-roadmap-v1 §8.1).

4.4 Release-time — "risk-delta" check​

Every release-shepherd-led release runs a "risk-delta" check:

  • Any new risk surfaced by the release? Documented in the release notes under a "Risk delta" heading.
  • Any mitigation that has regressed (test removed, config flipped) on any row of the register? Block the release until either restored or Agent #40 + Agent #36 sign off.

Verifiable by inspecting the release notes — the "Risk delta" heading must be present even if its body is "none."

4.5 Regulator inspection — interim review​

Every regulator inspection (DPB §17 update, RBI sandbox progress report, a bank's internal audit walk-through, a SOC 2 auditor fieldwork day) triggers an interim review of the relevant slice of the register the day before the inspection. The review confirms the "Last reviewed" column is current and that no residual has drifted since the last weekly walk.


5. Risk-acceptance protocol​

The acceptance bands from §2.5 map to acceptance procedure:

5.1 Residual <= 6 (low-amber): auto-accept​

Recorded in this register with the named sign-off in the row. Reviewed at the cadence in §4.

5.2 Residual 7–12 (mid-amber): formal review​

Review required by Agent #36 (CCO) plus Agent #1 (CTO). The review record is committed to docs/compliance/risk/acceptances/<R-ENT-NN>-<yyyy-mm-dd>.md with the following fields:

  • Risk ID + title.
  • Date of review.
  • Reviewers (Agent #36, Agent #1, and any subject-matter expert pulled in).
  • Mitigation roadmap (commits to land, target weeks).
  • Re-review date (default 30 days; sooner if mitigations are landing fast).
  • Sign-off signatures (in the form Agent #36: accept).

Mid-amber risks are reviewed monthly per §4.2 until they drop to low-amber or graduate to red.

5.3 Residual >= 13 (red): hard-stop​

No new pilot signed, no new release shipped, until either:

  • the residual drops below 13 via additional mitigations, or
  • the founders (Agent #1 + Agent #28) explicitly sign off in writing with a documented mitigation roadmap and a target re-review date not later than 30 days out.

The founder sign-off record is committed to docs/compliance/risk/acceptances/<R-ENT-NN>-founder-<yyyy-mm-dd>.md and is referenced by ID from this register's row "Residual sign-off" column.

At v1 issue no risk is in the red band after mitigation. Every row sits at residual <= 6.


6. Operating principles​

These are the rules the register lives by — they are not risk-specific, they apply across the document.

6.1 Owners are named individuals​

Risk owners must be named individuals, identified by agent number, not roles. No "TBD," no "the security team." If a row's owner is ambiguous, Agent #40 escalates to Agent #36 within 24 hours of discovery. The escalation must resolve into a single named agent number — not into a working group.

6.2 Mitigations must be testable​

Every mitigation listed under a risk must be verifiable by a test, an audit, a code review, or an inspectable artefact (commit, ADR, doc). "We will be careful" is not a mitigation. "ADR 0010 SHA-256 pins the snarkjs bundle and CI fails on mismatch" is. If a mitigation cannot be verified, the owner must propose how to verify it within 7 days, or the mitigation is removed and the residual re-scored.

6.3 Risks must be re-assessed on event triggers​

Beyond the calendar cadence in §4, risks must be re-assessed when any of the following occurs:

  • A regulator notification (DPB, RBI, SEBI, a bank's internal auditor) changes — i.e., a new rule, a new circular, a new interpretation memo.
  • The customer base composition shifts > 20 % — e.g., the largest customer's share crosses the 20-point threshold up or down.
  • A competitor enters the market (a new ZK identity vendor opens India operations) or exits (a domestic incumbent shutters its identity product).
  • A major dependency reaches end-of-life (snarkjs deprecation, circomlib break, Node.js LTS expiration, Base L2 deprecation, Hardhat major bump).
  • A security incident at any severity is declared (links into the incident-response runbook drafted A40-W1-Tue).

The re-assessment fires within 5 business days of the triggering event and updates the affected rows' "Last reviewed" column.

6.4 Register-quality discipline​

Agent #40 owns register-quality. A row that has gone > 60 days without a "Last reviewed" date update is a discipline failure, not a risk: it is fixed in the next weekly walk and a note is added to docs/compliance/risk/walks/<date>.md recording the lapse.

6.5 Cross-references are bidirectional​

When a threat-model A-NN row references this register (e.g., "this attack materialises R-ENT-03"), the corresponding R-ENT row must reference back. CI runs a cross-reference linter weekly (compliance-roadmap-v1 §8.5).


7. Risk-residual-acceptance sign-offs (v1)​

Each row's residual-acceptance signature is listed for v1 issue. At v1 every residual sits in the low-amber band so the sign-off is the auto-accept by the row's owner; no founder sign-off is required.

Risk IDTitleInherentResidualOwnerSign-offDate
R-ENT-01Concentration risk (BFSI / India)166Agent #42Agent #42: accept2026-05-28
R-ENT-02Supply-chain attack via deps126Agent #26Agent #26: accept2026-05-28
R-ENT-03DPDP §8 reportable breach156Agent #37Agent #37: accept2026-05-28
R-ENT-04Trusted-setup bad-actor compromise104Agent #11Agent #11: accept2026-05-28
R-ENT-05Vendor lock-in / lapse94Agent #50Agent #50: accept2026-05-28
R-ENT-06Key person dependency126Agent #1Agent #1: accept2026-05-28
R-ENT-07Ceremony / circuit-version slip94Agent #11Agent #11: accept2026-05-28
R-ENT-08Contract bug post-deployment106Agent #25Agent #25: accept2026-05-28
R-ENT-09On-chain anchor disruption94Agent #25Agent #25: accept2026-05-28
R-ENT-10AML / sanctions-listed enrolment104Agent #37Agent #37: accept2026-05-28

Counter-signature by Agent #36 (CCO) confirming all v1 residuals are within auto-accept band: Agent #36: accept (2026-05-28).

Counter-signature by Agent #1 (founder / CTO) confirming the classification framework and the cadence in §4: Agent #1: accept (2026-05-28).


LAST_UPDATED: 2026-05-28 OWNER: Agent #40 (Risk & Audit Lead) NEXT REVIEW: 2026-06-01